The Shanxi 1000-ton/day iron ore beneficiation project has a clear technical route, with the mainstream adopting a combined crushing-grinding-magnetic separation process, which is suitable for magnetite resources in Loufan and other areas of Shanxi. The project is provided by a professional mining engineering company as an EPC general contracting service, which can realize the integrated implementation from design, equipment supply, to installation and commissioning.

山西1000吨/日铁矿石选矿项目

Detailed Process Flow

1. Ore feeding and transportation
Ore bins and belt conveyors
Achieve continuous and stable material supply and prevent blockages.

2. Crushing and screening
Jaw crusher + cone crusher
Two-stage crushing to ≤15mm improves grinding efficiency.

3. Grinding and Classification
Ball mill + hydrocyclone
This constitutes a closed-loop system, controlling a particle size of -200 mesh or more, accounting for over 85%.

4. Magnetic separation operation
Permanent Magnet Drum Separator (CTB Series)
Weak magnetic field separation of magnetic iron minerals can achieve a recovery rate of over 90%.

5. Concentration and Dehydration
High-efficiency thickener + filter press
To achieve a concentrated dehydration rate of <15%, facilitating transportation and sales.

6. Tailings treatment
Tailings dry discharge system or water recycling
It meets environmental protection requirements, with a water recycling rate exceeding 90%.

Note: If the ore contains weakly magnetic minerals such as hematite or limonite, consider adding a strong magnetic separation or flotation process for comprehensive recovery.